Table X. Forecasts (Fs and Catches are including estimated unallocated removals)

Description\Variable Fbar16 Fbar17 Fbar18 SSB16 SSB17 SSB18 SSB % change C16 C17 C18

TAC constraint, then F = 0.3: MANAGEMENT PLAN0.17 0.30 0.30 338851 408220 415738 2 72782 142085 142909
TAC constraint, then precautionary approach0.17 0.69 0.69 338851 408220 278778 -32 72782 276567 201844
TAC constraint, then zero catch0.17 0.00 0.00 338851 408220 565573 39 72782 0 0
TAC constraint, then FMSY0.17 0.34 0.34 338851 408220 400668 -2 72782 156489 152590
TAC constraint, then F20160.17 0.37 0.37 338851 408220 388942 -5 72782 168103 159803
TAC constraint, TAC 20160.17 0.15 0.13 338851 408220 483602 18 72782 75454 77057
TAC constraint, then Fpa (1.4)0.17 0.38 0.38 338851 408220 384554 -6 72782 172276 162376
TAC constraint, then Fpa (sigma)0.17 0.37 0.37 338851 408220 385745 -6 72782 171142 161684
TAC constraint, then FMSy lower (wo AR)0.17 0.20 0.20 338851 408220 459834 13 72782 99749 108806
TAC constraint, then FMSy upper (w/wo AR)0.17 0.38 0.38 338851 408220 384554 -6 72782 172276 162376